■ Because you may install more than one appliance in the ■ When mounting an appliance in an equipment rack,Įnsure that the rack is bolted to the floor. Information will help you plan the equipment rack Rack Installation Safety Guidelines and the following Rack, it requires one EIA 1.75-inch (4.4-cm) vertical mountingĬaution: You must leave clearance in the front and rear of the CSACS-1121 Series appliance, to allow cooling air to be drawn in through the front and circulated through the appliance and out the rear of the appliance. Mid-mount the appliance in a 19-inch (48.3-cm) equipment rack thatĬonforms to the 4-post rack specification (the inside width of theĪppliance in the brackets. You will use these handles later when you install theĪppliance in a 4-post rack. Series appliance has a set of rack handles (installed at theįactory).
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |